Instrumentation and Monitoring
Applies to Mission Monitor, Mission Designer and Mission Manager.
- State of the art Instrument models for all common forms of instrumentation from simple prisms and levelling to complex compound instruments such as inclinometers.
- Example derived instruments focussed on specific engineering calculations eg building distortion and torsion, track tilt, cant, versine and many more
- Models for absorbing data output from Plaxis, Flac, RS2 etc
- Example passive lookup models linking prediction to progress and monitoring.
- Published models for dynamically predicting ground and structure performance for consolidation, lateral deflection, ground settlement over tunnels and simple structural calculations eg beams under load, piles etc.
- Models for geospatial prediction eg noise and vibration.
- A sample data set in its separate hierarchy
- Using that data set sample graphs, reports and dashboards demonstrating how I&M data can be displayed in maps, displays, sections, graphs and tables.
Drill and Blast Tunnelling
Applies to Mission Builder, Mission Manager
- Predefined shift report structures and delay time codification schemes
- Predefine plant and labour structures
- Predefine inventory structures
- State of the art sets of construction data models for records associated with drill and blast tunnelling in various parts of the world including Probing, Grouting, Face drilling, Charging, geological Mapping, Support Determination and Installation.
- Pre-defined connections to typical drill and blast machinery eg: Sandvik, Atlas Copco, Epiroc and others including control files and measure while drilling.
- Geospatial prediction models for various locations covering vibration prediction (instantaneous charge weights) and site boundary noise limits.
Mechanised Tunnelling
Applies to Mission Builder, Mission Manager.
- Predefined shift report structures and delay time codification schemes
- Predefine plant and labour structures
- State of the art sets of construction data models for records associated with mechanised tunnelling including probing, grouting, interventions and hyperbaric management, cutter wear and changes, segment building and inspection, water proofing, drainage and insitu concreting.
- Real Time Mimic Screens for 6 different types of TBM
- Real time Mimic Screens for Vertical Shaft Sinking Machines
Modular Construction
Applies to Mission Manager
- Predefined shift report structures and delay time codification schemes
- Predefine plant and labour structures
- State of the art sets of construction data models for records associated with pre-casting and fabrication.
- Pre-prepared and adaptable factory management systems for static factories
- Pre-prepared automated time management systems for automated and datalogged carousels
- Mimic screens for