Looking for something? Unlock the construction industry’s latest buzzwords, trends, and technology with Maxwell GeoSystems’ dynamic glossary!
This glossary provides clear, concise definitions of key concepts in construction and infrastructure management, helping readers understand the technologies, processes, and practices that shape the industry. It serves as a quick reference for both technical and non-technical audiences looking to stay informed in a rapidly evolving field.
A geotechnical instrument used to monitor structural movement in three dimensions (X, Y, Z). Unlike sensors that stream data, it is read manually or automatically by a total station. Commonly installed on structures, railways, or with inclinometers, it provides accurate and easy-to-interpret displacement data.
Notifications are triggered when monitored parameters exceed predefined thresholds. They help project teams respond quickly to safety, environmental, or operational risks by providing real-time updates from sensors, monitoring systems, or equipment, reducing the likelihood of costly delays or incidents.
The licensed professional or firm responsible for designing a project, preparing technical specifications, and overseeing construction to ensure compliance with plans. They play a central role in coordinating disciplines, addressing design changes, and safeguarding quality and safety.
This is a precise digital or physical record of a completed project, showing the exact dimensions, locations, and specifications after construction. Created using surveys, scans, or updated BIM models, it reflects changes from the original design and supports operations, maintenance, and future project modifications.
It’s an organized system for monitoring, servicing, and improving physical assets from acquisition to disposal. In construction and infrastructure, AMS integrates data, analytics, and maintenance schedules to improve asset performance, extend lifespan, reduce costs, and ensure compliance with safety and operational standards.
Augmented Reality (AR) overlays digital information on the real world, while Virtual Reality (VR) immerses users in a wholly digital environment. For construction, AR/VR enhances design visualization, site training, safety planning, and stakeholder engagement by allowing users to explore projects interactively before or during execution.
This utilizes technology such as sensors, IoT devices, drones, and scanners to collect information without manual entry. In construction, it enhances accuracy, minimizes delays, and facilitates real-time monitoring of progress, safety, and performance by seamlessly integrating data into project management and analytics systems.
Generates and delivers reports automatically at scheduled intervals or in response to specific events, thereby reducing manual effort and ensuring a timely flow of information. In construction projects, automated reporting streamlines progress tracking, compliance documentation, and performance monitoring.
An electronic surveying instrument that automatically measures angles and distances to reflective targets like prisms. In geotechnical monitoring, ATS continuously tracks 3D movements (X, Y, Z) of structures with high accuracy, reducing the need for manual surveys.
Material used to refill an excavation or void after construction work, such as laying foundations or installing utilities. Proper backfilling ensures structural stability, supports load-bearing capacity, and protects underground elements from damage or erosion.
The process of collecting initial measurements before project work begins involves establishing reference conditions for future comparison and reference. It provides a benchmark to track changes, assess project impacts, and ensure compliance with design specifications or environmental standards.
It refers to massive datasets that are too complex for traditional processing tools. In construction, it encompasses data from sensors, project records, and geospatial sources, enabling predictive analytics, risk management, and informed decision-making when properly analyzed and interpreted.
The seamless connection of Building Information Modelling (BIM) data with other project systems or workflows. It improves collaboration, data accuracy, and decision-making by enabling real-time updates between 3D models, schedules, cost data, and operational platforms.
A milestone marking the moment when construction work in tunnelling or excavation reaches a planned endpoint, often connecting two excavation fronts. It represents a significant milestone in project progress, requiring precise planning, meticulous monitoring, and robust safety measures.
The continuous or periodic observation of a bridge’s structural performance using sensors, inspections, and data analysis. It helps detect early signs of stress, movement, or deterioration, enabling timely maintenance and ensuring safety and service life.
This is a digital representation that captures both the physical attributes and functional details of a built asset. It allows stakeholders to collaborate on design, construction, and operation through a shared, data-rich 3D model, improving efficiency, reducing errors, and enhancing lifecycle management.
Basic piezometer using an open pipe to measure groundwater levels in boreholes. Useful for long-term and cost-effective monitoring. Simple to install and requires minimal maintenance.
It provides data storage, processing, and software services over the internet, rather than on local servers. In construction, cloud solutions enable teams to access real-time project data, collaborate remotely, and scale digital tools without incurring significant investment in physical IT infrastructure.
An online service for storing and managing digital files, enabling secure, remote access from any location. In construction, it allows teams to share project documents, sensor data, and models in real-time, enhancing collaboration and version control.
It is a shared digital platform where all project information is stored, managed, and accessed by authorized stakeholders. It ensures a single source of truth, improves collaboration, reduces duplication, and maintains version control across the project lifecycle.
Composite Instruments combine multiple sensors in one unit to monitor parameters like displacement, strain, or pressure. Installed in structures or boreholes, they provide integrated data, simplifying measurement and interpretation for geotechnical monitoring.
The disciplined process of handling changes to project systems, designs, or documentation. It ensures that all modifications are tracked, approved, and implemented consistently, reducing errors and maintaining compliance with requirements.
This describes the industry’s shift towards technology-driven methods, sustainability, and collaboration. It leverages digital tools and software, modern procurement models, and advanced materials to boost efficiency, safety, and quality while reducing costs and environmental impact.
The collection of legally binding documents defining the project’s scope, terms, and conditions. These include drawings, specifications, schedules, and agreements, serving as the reference for responsibilities, performance expectations, and dispute resolution.
The process of managing, supervising, and verifying construction activities to ensure they meet design specifications, safety standards, timelines, and quality requirements. It involves monitoring progress, resources, and compliance throughout a project.
This includes all project-related information generated throughout its lifecycle — from design files and sensor readings to schedules and financial records. Properly managed, this data drives better decision-making, risk management, and operational efficiency across teams and stakeholders.
It is a digital platform that enables planning, coordination, and control of construction projects. It centralizes tasks such as scheduling, budgeting, document control, and reporting, improving communication, efficiency, and decision-making across teams.
A method used to represent the three-dimensional shape of terrain or subsurface features on a two-dimensional surface. It involves drawing contour lines that connect points of equal elevation or value, allowing for quick interpretation of slopes, depths, and gradients.
A fixed, precisely measured location used as a reference in surveying and construction. Control points ensure accuracy in setting out works, aligning structures, and integrating geospatial data across different phases of the project.
Special bolt installed in tunnels to track changes in rock displacement and convergence. Provides early warning of ground movement. Easy to install and cost-effective for long-term monitoring.
Digital models that calculate tunnel convergence from multiple sensor readings instead of single instruments. This allows engineers to track deformation trends without installing extensive hardware.
The practice of planning, monitoring, and controlling expenses to keep a project within budget. It involves forecasting, tracking actual costs, and identifying variances, enabling informed decisions that optimize financial performance.
Visual interfaces that consolidate and present project data in charts, graphs, or metrics. They provide at-a-glance insights into progress, risks, and performance, enabling faster and more informed decision-making.
It is the process of evaluating raw data to reveal trends, patterns, and insights that support better decision-making. In construction, it helps predict risks, optimizes resources, tracks performance, and improves planning by turning complex datasets into actionable information for stakeholders.
A method of integrating data from multiple, independent sources into a single, unified view without physically consolidating it. It enables teams to access and analyze information in real-time while maintaining autonomy of the source system.
Ensures that collected information is accurate, consistent, and reliable for analysis and decision-making. This process involves verifying data for accuracy, completeness, and adherence to established standards before use. By maintaining high-quality data, projects can minimize risks and improve efficiency.
This represents complex data in graphical or interactive formats such as charts, maps, or dashboards. In construction, it facilitates the understanding of project performance, risks, and trends, enabling faster decisions and more transparent communication between technical teams and non-technical stakeholders.
This is a centralized repository that stores large volumes of structured data from multiple sources. It enables fast querying, reporting, and analytics, supporting better decision-making. In construction, data warehouses integrate project, financial, and operational data for analysis and tracking long-term trends.
Instruments that do not directly measure a parameter but calculate it using data from primary sensors. They are required when direct measurement is difficult or impossible. Values are derived through correlations, formulas, or combined sensor outputs, providing insights such as stress, load, or deformation.
The process of checking whether a design meets its specified requirements and functions as intended. It ensures accuracy, safety, and compliance before moving to construction, manufacturing, or implementation.
It is a project delivery method where design and construction services are contracted to a single entity. This approach fosters collaboration, speeds up project timelines, reduces costs, and minimizes disputes by aligning design, engineering, and construction teams under one contract.
A project phase where preliminary designs evolve into detailed plans and specifications. It refines layouts, materials, and systems based on feedback, ensuring the design meets technical, functional, and budget requirements before final documentation.
A centralized, real-time view of operations enabled by connected systems, data analytics, and visualization tools. In construction, it offers visibility across projects, improving decision-making, risk management, and resource allocation.
This occurs when digital tools and systems are implemented but fail to deliver value due to poor integration, lack of user adoption, or incompatible data formats. Overcoming it requires a clear strategy, stakeholder engagement, and ensuring technology aligns with business goals.
It combines advanced modelling, simulation, and data-driven tools to design, build, and manage infrastructure projects. It utilizes technologies such as BIM, digital twins, and automation to enhance efficiency, accuracy, and collaboration throughout the project lifecycle, from concept to operation.
It refers to the strategic use of digital technologies to improve business operations, transform workplace culture, and enrich customer experiences. In construction, DX integrates tools such as BIM, IoT, and AI to streamline workflows, improve collaboration, and drive measurable performance improvements.
This is a virtual replica of a physical asset, process, or system that is continuously updated with real-time data. In construction, it enables monitoring, simulation, and predictive analysis, helping optimize performance, reduce risk, and plan maintenance effectively.
Beam installed on structures to detect small tilts or settlements, measured by precise leveling methods. Often used in building or retaining wall monitoring where accuracy is critical.
A measure of how well a project or asset minimizes environmental impact. It considers factors such as emissions, waste, energy use, and compliance with sustainability goals or regulatory requirements.
A chronological record of activities, incidents, or system changes. Event logs track what happened, when, and by whom, aiding in audits, troubleshooting, and maintaining project accountability.
Exploratory Data Analysis (EDA) is the process of examining datasets to summarize their key characteristics, often using visual methods. In construction, EDA helps identify trends, anomalies, and relationships in project data, supporting better planning, risk assessment, and problem-solving.
The use of historical data, trends, and predictive models to estimate future outcomes. In construction, forecasting supports resource planning, budgeting, and scheduling by anticipating potential challenges and determining expected performance levels.
Gas leakage sensors detect the presence of hazardous gases in the environment or confined spaces. They provide early warning of leaks, ensuring safety in tunnels, underground works, and construction sites by preventing accidents and health risks.
An integration of geospatial data with Building Information Modelling. This combination enables spatial analysis, visualization, and improved decision-making for infrastructure projects, especially those with complex site and terrain conditions.
GIS capture, store, analyze, and visualize spatial or geographic data. In construction, GIS supports site selection, infrastructure planning, and environmental analysis by integrating maps, geotechnical data, and project information for informed decision-making.
Geotechnical instrumentation refers to the use of specialized instruments to monitor soil, rock, and structural behavior during construction and operation. It helps measure parameters like pressure, displacement, and vibration, ensuring safety, quality control, and performance assessment of projects.
A high-precision method of tracking the position and movement of structures or ground surfaces using satellite-based systems. It provides accurate, continuous data for deformation analysis, safety monitoring, and construction control.
GPS trackers are devices that use satellite signals to monitor and record the real-time position of equipment, vehicles, or structures. In construction, they help track asset location, movement, and site activities for safety and efficiency.
Transparent gauge fixed across a crack to measure relative displacement or widening over time. It is a simple yet reliable tool for tracking crack progression in masonry and concrete structures.
A digital representation of subsurface conditions created from geotechnical and geological data. It helps engineers understand the behavior of soil, rock, and groundwater, guiding design decisions and risk management.
Categories of derived monitoring data calculated from primary measurements. These parameters, such as rates of change or combined stress values, provide deeper insight into structural or ground behavior.
Visual warnings are placed on-site to indicate specific dangers, such as falling objects, electrical hazards, or restricted areas. They enhance safety by alerting workers and visitors to potential risks before they enter hazardous areas.
A graphical representation where data values are shown using color intensity. In construction, heatmaps highlight patterns, risks, or performance issues in a visually intuitive way, aiding quick analysis.
Chain of tilt sensors installed in boreholes to continuously track ground or structural movement. Provides real-time automated readings without the need for manual surveys.
Instrument installed in boreholes to measure lateral ground movement; typically read once daily. Useful for detecting slope instability or ground settlement trends over time.
Interferometric Synthetic Aperture Radar (InSAR) is a remote sensing method that analyzes satellite radar images to measure ground movement with millimeter-level precision. In infrastructure projects, InSAR is valuable for monitoring subsidence, slope stability, and structural deformation over time, eliminating the need for on-site inspections.
A process of reviewing and verifying monitoring data to ensure accuracy, consistency, and reliability. It follows standard audit practices like data validation, cross-checking with baseline values, and identifying errors or anomalies for quality assurance.
Each instrument type and subtype is defined by its applications, the measurements it provides, monitoring capabilities, and data range. This classification ensures accurate selection for project needs and reliable performance in geotechnical monitoring.
Refers to the use of specialized devices and sensors to measure, monitor, and record physical or environmental parameters on a project. These tools help capture accurate data for performance assessment, safety monitoring, and decision-making.
Capability to ingest, validate, visualize, and report instrumentation data (inclinometers, piezometers, extensometers, tiltmeters, vibration monitors). In construction, it tracks parameters such as ground movement and structural load, supporting safety, compliance, and proactive maintenance.
Devices designed to measure specific parameters such as pressure, temperature, displacement, vibration, or groundwater levels. They play a critical role in monitoring construction, geotechnical, and environmental conditions. Accurate readings from these devices help ensure compliance, detect anomalies early.
A centralized software solution that connects core business processes—such as finance, procurement, human resources, and project management—into one platform. This integration streamlines workflows, reduces data silos, and improves operational efficiency.
The Internet of Things (IoT) refers to a network of connected sensors, devices, and systems that collect and share data. In construction, IoT enables real-time monitoring of equipment, environmental conditions, and structural health, thereby improving safety, efficiency, and informed decision-making throughout the project lifecycle.
A collaborative process where experts from multiple disciplines analyze data together to reach a shared understanding. This approach ensures complex information is viewed from different perspectives, improving the accuracy of conclusions.
A measurable value used to track progress toward specific objectives. These metrics provide insight into efficiency, quality, safety, or cost performance over time. By setting clear benchmarks, teams can monitor success, identify areas for improvement, and maintain accountability.
A continuous flow of real-time information from sensors, instruments, or systems to a central platform. It provides instant visibility into conditions and performance, enabling teams to act quickly in the event of issues. Live streaming ensures decision-makers are equipped with the latest data.
Device that tracks ground settlement or heave by measuring the position of magnetic rings along a borehole. It helps assess deep ground movement at different soil or rock layers.
A series of micro-electro-mechanical tilt sensors linked in a chain to monitor deformation profiles underground. They provide continuous, automated readings ideal for long-term ground or structural movement studies.
A series of sensors based on Micro-Electro-Mechanical Systems (MEMS) technology, linked together to measure ground or structural deformation. Each node records tilt or inclination, and when combined, the chain provides a detailed profile of displacement or settlement along its length. They are commonly used in geotechnical monitoring of slopes, tunnels, embankments, and foundations.
A lightweight messaging protocol designed for quick and efficient communication between devices in Internet of Things (IoT) networks. Designed for low-bandwidth, high-latency networks, it enables reliable data transfer from sensors and instruments to central systems.
Automated alerts that inform users about significant events, data changes, or threshold breaches. Delivered via email, SMS, or in-platform messages, they ensure critical information reaches the right people instantly. It enables teams to take timely actions, mitigate risks, and provide project performance and safety.
A project management approach where designs and construction plans are adjusted based on ongoing monitoring and measured performance. It relies on real-time data to guide decision-making, reducing uncertainty and optimizing resources. This method is widely used in geotechnical and underground works.
A visual layer added to digital maps, models, or plans to provide additional information without altering the original data. It can display monitoring results, construction progress, or design changes, helping users quickly compare different datasets. Overlays help simplify the understanding of complex information by providing it within a relevant context.
An instrument that measures pore water pressure using compressed gas and diaphragm movement. Often used in embankments, dams, and foundations for long-term stability monitoring.
Predefined limits based on data analysis that forecast potential issues before they occur. By monitoring trends and comparing them to these thresholds, teams can take preventive measures to address the possible problems. This proactive approach helps avoid costly delays, safety incidents, and equipment failures.
Project 13 is an industry initiative promoting collaborative, result-focused delivery models in infrastructure. It encourages integrated teams, aligned incentives, and the use of digital technology to drive productivity, improve asset performance, and deliver long-term value for owners and stakeholders.
Ensures that processes, materials, and outputs consistently meet defined standards and project requirements. It involves planned, systematic activities to prevent defects (Quality Assurance) and the inspection, testing, and verification of work to identify and correct issues (Quality Control).
Enhancements made to processes, materials, or systems to increase performance, reliability, and compliance with standards. In projects, they involve better design practices, advanced technology, or more efficient workflows. Continuous improvement drives long-term cost savings.
Quantity Surveying involves overseeing costs, contracts, and purchasing throughout construction projects. Quantity surveyors estimate budgets, monitor expenses, control risks, and ensure value for money while meeting the required quality and performance standards.
The process of tracking conditions and performance as they happen, using sensors, IoT devices, and monitoring systems. It enables instant detection of anomalies and rapid response to potential risks. Real-time data supports informed decision-making and helps maintain safety, quality, and efficiency in projects.
Structures designed to restore groundwater by allowing surface water to seep into underground aquifers. In tunneling projects, they are used to offset dewatering impacts and maintain groundwater balance.
The process of identifying, evaluating, and applying strategies to minimize potential risks in a project. It includes preventive measures, contingency planning, and continuous monitoring to minimize impact. Effective risk mitigation ensures safety, reduces delays, and protects financial and reputational interests.
RTS is an advanced surveying instrument that automatically tracks and measures targets like prisms without manual operation. It records precise 3D coordinates (X, Y, Z) over time, making it widely used in geotechnical monitoring, construction, and structural health assessments.
Instrument with rods anchored at depth to measure settlement or displacement within soil or rock layers. Useful in tunneling, mining, and slope stability studies.
Represents periodic signals sent by a device to confirm it is active and functioning correctly. These signals help project engineers detect faults or communication issues early on, ensuring continuous data collection and system reliability in monitoring and control applications across the entire project.
The process of measuring and tracking vertical ground or structural movement over time to detect settlement or subsidence. It helps assess stability, safety, and performance during and after construction.
Linked accelerometers measuring changes in shape or profile of soil and structures in real time. Ideal for tunnels, dams, and retaining walls where deformation monitoring is critical.
Refers to a centralized, authoritative repository where data is stored, managed, and regularly updated. This transparent approach eliminates data silos, reduces errors, and ensures project stakeholders work from consistent, accurate, and verified project information.
A site investigation gathers essential data about subsurface and environmental factors at a location. It ensures accuracy, safety, and compliance before moving to construction, manufacturing, or implementation.
A software delivery model in which applications are hosted on cloud servers and accessed by users over the internet. It enables scalability, regular updates, and reduced infrastructure costs, providing users with secure, on-demand access from any location.
Fixed marker installed on a building or structure to monitor movement using surveying instruments. Data is typically collected with total stations or RTS systems.
This acts as a bridge between multiple systems, applications, or databases, enabling seamless integration and data exchange for better project control and visibility. It streamlines workflows, reduces manual intervention, and supports efficient, interconnected digital ecosystems.
A reliable information source that serves as the official repository for specific datasets. It ensures accuracy, traceability, and compliance, forming the foundation for analytics, reporting, and decision-making in complex projects.
Simple manual tool to measure changes in distance between fixed anchor points. Often applied in tunnels, slopes, or excavation sites. Reliable for periodic manual measurement programs.
Key operational metrics from Tunnel Boring Machines, such as thrust, torque, penetration rate, and cutterhead speed. Monitoring these values ensures safe tunnel excavation, optimizes machine performance, and helps prevent costly downtime.
Simple device placed in cracks to monitor opening or closing movement in masonry or concrete. Often used for long-term monitoring of structural health and stability.
An instrument used to measure small changes in inclination, slope, or rotation of a structure or ground surface. It continuously monitors angular movement and is often used in tunnels, retaining walls, dams, and buildings to detect settlement or instability.
A method of analyzing data points collected over time to uncover patterns, trends, and unusual variations. It supports predictive insights, operational optimization, and early detection of issues in engineering and construction projects.
Predefined thresholds that, once surpassed, activate specific actions or alerts. They are essential for proactive risk management, helping ensure safety, compliance, and operational efficiency in engineering projects.
A massive, specialized machine used to excavate tunnels with precision and efficiency through various ground conditions. It uses a rotating cutting wheel at the front to break rock or soil, while a series of systems support excavation, muck removal, lining installation, and safety.
A specialized platform for collecting, storing, and analyzing tunneling project data. It integrates inputs from TBMs, monitoring instruments, and construction teams to support planning, safety, and performance optimization.
Survey markers installed inside tunnels to monitor settlement and ground movement over time. These points provide reference data to ensure tunnel safety and structural integrity.
Involves measuring and assessing conditions in subsurface environments, such as ground movement, water ingress, or structural stability. It ensures project safety, compliance, and early detection of potential hazards.
Remotely operated or autonomous drones used to capture aerial imagery, survey sites, and collect data. They enhance efficiency, mitigate risks, and deliver high-resolution insights for construction and infrastructure projects.
Tracks the operational status of systems or equipment to measure productivity and identify causes of outages. These insights help improve reliability, optimize maintenance, and minimize costly interruptions.
Define the access rights and responsibilities assigned to each individual within a system. This structure enhances security, prevents unauthorized actions, and ensures users can only perform tasks relevant to their responsibilities.
The process of locating and documenting underground services, including water, gas, electricity, and telecommunications. It minimizes excavation risks, supports planning, and reduces costly service disruptions across the project lifecycle.
Visual representations showing the difference between planned and actual project data, such as excavation progress or ground conditions. They help project engineers to identify deviations and guide corrective actions, reducing delays and mitigating risk.
Sensor that measures crack movement in structures by detecting changes in wire tension. Provides precise readings even in harsh site conditions.
Sensor measuring horizontal displacement within soil or fill materials. Commonly used for monitoring embankments and ground stability. Data helps evaluate settlement patterns over time.
Device that measures loads in anchors, struts, or supports using changes in vibrating wire frequency. Ensures safety by tracking applied and transferred forces over time.
Sensor that measures pore water pressure in soil or rock with high accuracy. Widely used in dams, foundations, and deep excavations. Provides stable readings even in harsh conditions.
Instrument used to measure soil or rock pressure against retaining structures or tunnel linings. Helps assess load distribution and safety. Often applied in tunnels, retaining walls, and dams.
Embedded or surface-mounted sensor that measures strain in concrete, steel, or rock. Widely used in geotechnical, civil, and structural projects.
Measures ground or structural vibrations to assess their impact on surrounding environments. It is critical for protecting sensitive structures, ensuring compliance, and maintaining safety during construction activities.
Sensor that records ground or structural vibrations in three directions, useful for monitoring construction impact. It also helps detect early signs of structural distress or instability.
Interactive, digital interfaces displaying real-time project metrics, analytics, and KPIs. They enable faster decision-making, improve transparency, and centralize critical operational insights for better project delivery.
Virtual Rail Sensors are digital tools that use geospatial and monitoring data to simulate rail alignment. They help detect settlement, track movement, and deformation trends without installing physical devices on the rails.
Graphical displays that represent spatial data in two or three dimensions make complex information easy to interpret. They improve decision-making, collaboration, and situational awareness in projects.
The process of determining the quantity of material excavated, filled, or transported. It helps project engineers to support planning, cost estimation, and progress tracking in construction and mining operations.
Tracks water intrusion into tunnels, shafts, or underground structures. Early detection prevents damage, ensures safety, and supports the implementation of adequate drainage and waterproofing measures.
Devices are placed in tunnels or structures to detect seepage and monitor water ingress over time. The data supports preventive maintenance and long-term structural durability.
Instruments measuring environmental parameters like temperature, humidity, wind, and pressure at project sites. Data supports safety planning and helps correlate weather with construction performance.
Standardized protocols that enable different applications to communicate and exchange data over the internet. They enable system integration, automation, and streamlined workflows in digital environments.
The use of software to execute repetitive tasks and processes automatically, without manual effort. It helps increase efficiency, reduces errors, and frees up resources for higher-value activities.
A linked external file used in design and drafting systems to incorporate external data without duplicating it. This method supports collaboration, reduces file size, and ensures version control.
A profile view showing the shape and dimensions of a structure or excavation at a specific point in time. It helps engineers assess design compliance and monitor construction accuracy.
A spatial reference system using three values—X (horizontal), Y (vertical), and Z (elevation)—to define precise locations in three-dimensional space for mapping and engineering.
A structural or layout configuration where a path, tunnel, or track branches into two directions, resembling the letter “Y.” It aids in traffic flow or network design.
A designated area for storing equipment, materials, and machinery, and sometimes for prefabrication work, serving as a central hub for construction logistics.
The stage at which a material transitions from elastic to plastic deformation under stress. Understanding this limit for project engineers is essential for structural safety and design integrity.
A system capability that ensures no data is lost during transmission, storage, or processing in a construction project, safeguarding data integrity, compliance, and uninterrupted operations.
The area affected by construction activities, such as ground settlement, vibration, or structural movement. Identifying this zone helps project engineers manage risks and protect nearby assets.
Connect directly with a Maxwell GeoSystems support expert via email, or live chat.
Gain access to MGS Learn, the online learning platform for free, self-paced courses on product and topic-based certifications.
Discover all the latest product information on MissionOS and share your experiences with other system users.