A proven track record of successfully accomplished projects and a demonstrable capability across a wide range of challenging environments.

Project Case Studies

DC Water | USA

Maxwell GeoSystems provides high level data management for several key aspects to DC Water’s largest component of the Clean Rivers Project in Washington DC, USA.

Image Courtesy of TunnelingOnline.com
Image Courtesy of TunnelingOnline.com

The Northeast Boundary Tunnel (NEBT) is a reinforced concrete sewer tunnel (7m diameter, 15-48m deep), that will increase the capacity of the existing sewer system in Washington DC’s North East District.

Maxwell GeoSystems is providing its industry leading MisssionOS cloud-data platform, to meet the client’s needs for real-time feedback of ground deformation in conjunction with shaft construction & key TBM operation parameters.

Due to the sensitivity of surrounding infrastructure, the client relies on MissionOS ’s real-time alarm notification system to alert key parties of potential unwanted settlements.

Addtional key features implemented on this job include proximity functions to relate ground deformation to TBM operations, prediction models to estimate final settlement, and TBM parameter alarms.

The NEBT is the largest component of the Clean Rivers Project in Washington DC (USA) and will be built using the TBM “Chris” (92m in length).

The tunnel project faces a number of challenges including heavy clay and water bearing clayey sands at water pressures up to 3bar, a challenging alignment with 15 curves, and a complex work environment for shaft construction with small shaft sites combined with urban residential neighbourhoods and a high traffic corridor.

Parties afiliated with the Project: Designer: Brierley Associates; TBM Supplier: Herrenknecht; Slurry Walls, Jet Grout, Secant Piles, Solider Piles: Treviicos; Segmental Tunnel Liner Supplier: ConSeg JV; Muck Hauling: Bulldog; Construction; Instrumentation: Entech; Traffic Engineering & Instrumentation Installation: EBA; Construction Manager: EPC Consultants; DC Clean Rivers Program Manager: McMillan Jacobs and Greeley & Hansen.

Technical Summary

Instruments

408~ Installed & Operating 463 TBM Sensors 13 Types

TBM Drives

1

Shafts

7

Users

69

Status

Ongoing (Tunnelling started)

Most Responsive 24x7 Support Service

Customer Service
24x7 Customer Support

Connect directly with a Maxwell GeoSystems support expert via email, or live chat.

Learning
On Demand Learning

Gain access to MGS Learn, the online learning platform for free, self-paced courses on product and topic based certifications.

Community Blog
Community Blog

Discover all the latest product information on MissionOS and share your experiences with other system users.