Maxwell Logo
Try Now

News Hub

Caverns Project | Hong Kong

Empowering Hong Kong's Cavern Project | Maxwell GeoSystems

Maxwell GeoSystems has been appointed by the China State-Alchmex Joint Venture to provide its MissionOS Project Data Management System for the project Relocation of Sha Tin Sewage Treatment Works to Caverns – Main Caverns Construction in Hong Kong.

The system will be a provider for managing and presenting entire project data, that includes both instrumentation and construction data. The construction of the new main caverns complex at Nui Po Shan will cover around 14 hectares in area, along with a 260m long secondary access tunnel. There is also to be a ventilation shaft about 70m deep, with a ventilation adit around 660m long, as well a two effluent pipes of 2.2m diameter, each around 320m long. Site formation works at portal areas include; natural terrain mitigation measures and associated construction of relevant retaining structures.

Some of the key applications of MissionOS in this project include: Integration to project BIM, Risk Management System, real-time automatic drilling control system, Drill and Blast Process Control and Evaluation of Rock Reinforcement and Injection.

#MGS #ChinaState #Alchmex #InstrumentationData #ConstructionData #SaaS #MissionOS

No tags found for this post.

Most Responsive 24x7 Support Service

Customer Service
24x7 Customer Support

Connect directly with a Maxwell GeoSystems support expert via email, or live chat.

Learning
On Demand Learning

Gain access to MGS Learn, the online learning platform for free, self-paced courses on product and topic based certifications.

Community Blog
Community Blog

Discover all the latest product information on MissionOS and share your experiences with other system users.